Dec 2010: We now have a building site

The land has now been filled up and work underway in building the perimeter wall. We are also going to sort out the riverbank with a wall, which will be built at the current water level. We are about 10kms via the river from the sea so the river is tidal. However the land should not flood at this level - if it does it will be unprecedented, however we will still build our house 50cm above the current ground level. When this floods theres a world wide problem.

    small product photo   small product photo
Land filled
  Riverbank - which will have a balcony   Perimeter wall foundation
  Wall post

 

Dec 2010:

 

small product photo     small product photo   small product photo
Site boss   Extra helpers
 
   

small product photo

    small product photo   small product photo
Late worker  
  Site hq
   